SUN2000 (8KTL-28KTL)
Quick Installation Guide
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
24
LCD
Operation Procedure
2. Press to enter the Wizard page.
To return to the default page, press ESC. To
reset initialization parameters in the future,
choose Settings > Wizard as Advanced User.
3. After selecting a display language, click
.
The pages will be displayed in the selected
language.
4. After setting the correct date and time, click
.
To select the parameter, click . To set
the parameter value, set or .
The date is displayed in the format of
YYYY-MM-DD. The time is displayed in
the format of hh-mm-ss. in which hh, mm,
and ss stand for hour, minute, and second
respectively.
5. After setting the power grid standard code,
click .
To select a power grid standard code, click
or .
NOTE
When the illumination is weak, the grid code
cannot be successfully set. Wait until the
illumination becomes sufficient, log in to the
system as Advanced User , and choose
Settings > Init Wizard to set the grid code.
The SUN2000-28KTL applies only to the
medium-voltage grid-feeding scenarios. The
power grid standard codes supported are the
China medium-voltage grid standard code,
Germany medium-voltage grid standard code,
and user-defined medium-voltage grid standard
code.

Other manuals for Huawei SUN2000-8KTL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000-8KTL and is the answer not in the manual?

Huawei SUN2000-8KTL Specifications

General IconGeneral
BrandHuawei
ModelSUN2000-8KTL
CategoryInverter
LanguageEnglish

Related product manuals