Figure 5-28 Installing the cable
Step 2 Connect the signal cable to the COM port.
Figure 5-29 Securing the signal cable connector
----End
5.6.3 Connecting the Power Grid Scheduling Signal Cable
Cable Connection
The following
gure shows the cable connections between the inverter and the
Ripple Control Device.
SUN2000-(3KTL-10KTL)-M0
User Manual 5 Electrical Connections
Issue 06 (2020-10-23) Copyright © Huawei Technologies Co., Ltd. 52