EasyManuals Logo
Home>IBM>Computer Hardware>Power System S924

IBM Power System S924 User Manual

IBM Power System S924
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #32 background imageLoading...
Page #32 background image
Figure 15. Replacing the VPD card
Preparing the 9009-41A, 9009-41G, 9009-42A, 9009-42G, 9223-42H, or 9223-42S
system for operation after removing and replacing the service processor card
To prepare the system for operation after removing and replacing the service processor card, complete
the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover.
For a rack-mounted system, complete the following steps. Refer to Figure 16 on page 19
.
a. Slide the cover (A) onto the system unit.
b. Close the release latch (B) by pushing it in the direction shown.
18
Power Systems: Power Systems: Service processor card

Other manuals for IBM Power System S924

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System S924 and is the answer not in the manual?

IBM Power System S924 Specifications

General IconGeneral
BrandIBM
ModelPower System S924
CategoryComputer Hardware
LanguageEnglish

Related product manuals