MAINTENANCE SCHEDULE - ENGINEER
27
Please consult your manual for full information or consult your local dealer
Component Task 300 600 1200
Emergency stop switches
Check (operation)
Earth leakage RCD
(Residual Current Device)
1)
Check (operation)
External power socket box
(2)
Check (condition)
Battery terminals and voltage
Check (condition)
Battery clamps security and cleanness
Check (condition)
Control panel events history
Check
Bus bar cover safety switch
Check (operation)
Bus bar terminals
Check tightness
Machine earth connections
Check (condition)
Engine and controller harness
Check condition and connections
Generator alternator cables
Check (condition)
Generator alternator terminals
Check tightness
Alternator and engine mounting bolts
Check tightness
CCV (Crankcase Ventilation)
filter
Clean
CCV filter
(2)
Change
Exhaust ducts
Check (condition)
All hoses
Check (condition)
Engine oil
(2, 3)
Change
Engine oil filter
(2, 7)
Change
Fuel pre
-filter
(2, 4, 7)
Change
Fuel filter
(2, 4, 7)
Change
Fuel tank breather
(8)
Clean
Fuel tank breather
(2)
Change
Air filter outer element
(5)
Change
Coolant (inorganic)
(6, 10)
Drain and Fill
Radiator
Clean
Turbo charger
Check (condition)
FEAD(Front End Accessory Drive)
belt condition/tension
Check (condition)
FEAD belt
Change
After treatment system
(9)
Forced regeneration
Exhaust gas after treatment system visual inspection
Check (condition)
(1) In any case, every time the indicator is red.
(2) In case of low use: 12 months.
(3) For the oil specifications, refer to the table of the oils (Technical Data> Fluid, Lubricants and Capacities>
General).
(4) If the clogged filter warning signal activates, the filter must be replaced. If the water in pre-filter signal does
not deactivate after draining, the filter must be replaced.
(5) Interval to be halved for environmental conditions characterised by a high concentration of dust.
(6) Every 1200 hours or 2 years whichever is sooner. Coolant compliant with specifications ASTM D 6210; mixed
50% with water in the case of a concentrated product.
(7) Use only JCB specified filters.
(8) Or every 6 months.
(9) To be performed prior to engine oil change.
(10) Check which coolant type is installed in the machine before topping up the coolant. Mixing of different
coolant types is not recommended and may result in invalidation of the warranty offered by JCB. In the event of
mixing or if the coolant type is to be changed, the coolant circuit should be completely drained and flushed twice
with clean water before re-filling with fresh coolant.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb RENTAL Series and is the answer not in the manual?

jcb RENTAL Series Specifications

General IconGeneral
Brandjcb
ModelRENTAL Series
CategoryPortable Generator
LanguageEnglish

Related product manuals