EasyManuals Logo

JUKI JX-100 User Manual

JUKI JX-100
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
Operation manual
23
Step 2 Warm up the machine.
If you warm up the machine before PWB production, the machine can start PWB
production stably.
The “Warming-up” screen appears. Make the settings for the warming-up conditions.
Check to see if the safety cover is closed, and press the <START> switch of the
operation panel.
When you press the <START> switch, the machine starts moving.
To avoid risk of injury, never put your hand or head inside the
machine
Select
* Refer to Section 2.4 “Warming
Up” of the “Instruction Manual
CD” for details of the
“Warming-up” screen.
Select what to be warmed up.
Enter the time duration when the
machine stops, the number of
times the machine stops at which
the machine stops.
<Operation panel>
Press the <START> switch.
The axes and the conveyor start moving
and the warming up operation starts.
To finish the warming-up operation,
press the <STOP> switch.
(When you select the <Time> (Count) button, the
warming-up operation finishes when the specified time
passes or when the number of times the machine
warms up reaches the specified value.)
WARNING
Select the warming-up conditions.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the JUKI JX-100 and is the answer not in the manual?

JUKI JX-100 Specifications

General IconGeneral
BrandJUKI
ModelJX-100
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals