3.4.1 Domestic hot water
The mounting template is removed
before mounting the mounting rail, fitting
board, and fittings.
3.4.3 Gas connection
B The mounting template must be placed in the
desired place on the wall and fixed to it.
B a safety kit is fitted which provides a connection
to a visible drain system in the event of an
overpressure in the circuit.
Heating system safety valve
Take off your coat
For reasons of electrical safety,
the jacket is secured with a screw
against unauthorized disassembly
(safety on the electrical side).
Hanging on the wall
evacuation.
B Attach the connection plate to the wall with
the supplied dowels and screws.
3.4.2 Heating system
Caution: Damage to the installation
may occur due to debris left over from
installation.
FIG. 4 Connection
B Remove the packaging, following the instructions on
11
B Drill a hole in the wall for the piping
If all valves are closed, the static pressure must not
exceed 10 bar.
The gas line must be located and dimensioned in such
a way as to ensure the supply of gas to all appliances
connected to it.
B Remove the right side locking screw.
B Drill holes for screws 8 mm).
It is intended to protect the heating system and
the appliance from possible overpressure. From the
factory, the safety valve comes into operation when
the circuit pressure reaches the value of about 3 bar.
The hot water pipes and fittings are placed
in such a way that, depending on the existing supply
pressure, there is a loss of water flow at all points of
its collection.
B The jacket must always be fastened
with this screw.
If the installation has a non-return valve or a
pressure limiter at the domestic water inlet:
Gas and water connection
the.
B Wash the mains to remove debris.
Installing
B A pressure limiter is fitted to the system.
B Secure the retaining rail with the two screws and
dowels, which are also supplied.
B Check the position of the rail and the connection plate
and tighten the screws.
Otherwise:
B Set aside the cloak, pulling it forward.
i
i
Heating tour
173 Cold water connection
43
47
114 Domestic hot water connection (1/2 ")
112 Gas connection
6 720 610 828 RO (02.01)
Heating return
3.4 Installation of pipes
3.5 Mounting the device
Machine Translated by Google

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Junkers ZWE 24 MFA Series and is the answer not in the manual?

Junkers ZWE 24 MFA Series Specifications

General IconGeneral
BrandJunkers
ModelZWE 24 MFA Series
CategoryBoiler
LanguageEnglish

Related product manuals