Electronic regulator with external probe
Remote controls and programming clocks
TA 211 E
The grounding wire must be undisturbed while the other
cables have already been laid.
Fig. 13
B Telecomenzile TF 20, TW 2, TFQ 2 T/W sau
Fig. 14
Electrical connections
B TR 100, TR 200 are mounted according to the scheme of
B Secure the mains cable with the gland.
lower:
B Install according to the installation instructions of the
appliance.
the DT 1, DT 2 programming watches are installed in
accordance with the installation instructions of the
respective devices.
24 V
Continuously modulated room thermostat at
4.2 Connecting the room
thermostat, remote control
and programming clocks
6 720 610 828 RO (02.01)
Machine Translated by Google

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Junkers ZWE 24 MFA Series and is the answer not in the manual?

Junkers ZWE 24 MFA Series Specifications

General IconGeneral
BrandJunkers
ModelZWE 24 MFA Series
CategoryBoiler
LanguageEnglish

Related product manuals