EasyManuals Logo
Home>Kohler>Toilets>C3-430

Kohler C3-430 Installation Instructions

Kohler C3-430
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
2. Install the Remote Dock
1/16" or 1/4"
Holes
Remote Dock
Position the remote dock at the desired mounting location.
Conrm that the remote dock is lev
el.
Using a pencil, mark the two mounting-hole locations. Set the remote dock aside.
For installation into a stud or other wood surface: Drill a 1/16" hole at each of the
marked locations.
For installation using wall anchors: Drill a 1/4" hole at each of the marked
locations. Install the provided w
all anchors into the holes.
Position the remote dock over the anchors or marks. Secure the remote dock with
the provided screws.
Open the baery compartment on the remote control.
Install the four provided AA baeries in the orientation shown.
Place the remote control on the remote dock.
1354689-2-D
6 Kohler Co.

Other manuals for Kohler C3-430

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler C3-430 and is the answer not in the manual?

Kohler C3-430 Specifications

General IconGeneral
BrandKohler
ModelC3-430
CategoryToilets
LanguageEnglish

Related product manuals