EasyManuals Logo

Kubota SQ-1120 User Manual

Kubota SQ-1120
63 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
6 PREPARATION TO SUPPLY THE ELECTRIC POWER
PREPARATION TO SUPPLY THE ELECTRIC POWER
1. Generator grounding
The end user, equipment owner or operator must contact
his local, state, county or municipal electric code
department to determine the approved generator
grounding method to be used in his application or
location.
Recommendations in the NEC (National Electrical Code),
NFPA (National Fire Protection Association),
AUSTRALIAN STANDARDS and OSHA (Occupational
Safety and Health Administration) regulations must be
followed to assure compliance and safe operation.
Always be sure to ground (earth) the generator terminals
to comply with the local, state, national or OSHA
requirements.
One possible connection method for construction site use
is as follows:
(1) Load center cover
(2) Generator ground terminal
(A) #6AWG
Flexible copper ground
connection
(B) Metal ground rod or
building cold water pipe
system per N.E.C. code
1G296-8914.book 6 ページ 012年3月19日 月曜日 午前10時40分

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kubota SQ-1120 and is the answer not in the manual?

Kubota SQ-1120 Specifications

General IconGeneral
BrandKubota
ModelSQ-1120
CategoryPortable Generator
LanguageEnglish

Related product manuals