TABLE 2-1. INSTALLATION CHECK LIST
TASK PAGE
REFERENCE
PREPARATION
Unpack, inspect, and protect the unit. 33
Check electric power requirements. 34
Check gas power requirements. 34
Test supply water quality. 34
Select water treatment system. 36
Select operating location. 36
INSTALLATION
Position and level steamer. 38
Assemble packaged components. 38
Install and connect drain line. 43
Connect exhaust flue diverter. 44
Install and connect electrical line. 47
Install and connect water supply lines. 49
Test water supply lines. 50
Install and connect gas supply lines 50
Test gas supply lines. 51
Perform start-up checks. 55