Page 15
TABLE 3
OUTDOOR TERMINATION USAGE*
Input Size
Vent Pipe
Dia. in.
STANDARD CONCENTRIC
Flush
Mount Kit
Wall Kit
Field
Fabricated
1-1.2 inch 2 inch 3 inch
2 inch 3 inch
71M80
(US)
4
44W92
(CA)
69M29
(US)
4
44W92
(CA)
60L46 (US)
4
44W93
(CA)
51W11
(US)
51W12
(CA)
22G44
(US)
4
30G28
(CA)
44J40 (US)
4
81J20
(CA)
030,
045
6
1-1/2
3
YES YES
1
YES
5
YES
2
YES
2
3
YES YES
1
YES
5
YES
2
YES
2-1/2
3
YES YES
1
YES
5
YES
2
YES
3
3
YES YES
1
YES
5
YES
2
YES
070
6
1-1/2
3
YES YES
1
YES
5
YES
2
YES
2
3
YES YES
1
YES
5
YES
2
YES
2-1/2
3
YES YES
1
YES
5
YES
2
YES
3
3
YES YES
1
YES
5
YES
2
YES
090
2
3
YES YES
5
YES YES YES
2-1/2
3
YES YES
5
YES YES YES
3
3
YES YES
5
YES YES YES
110
2 YES YES
5
YES YES YES
2-1/2 YES YES
5
YES YES YES
3 YES YES
5
YES YES YES
NOTE - Standard Terminations do not include any vent pipe or elbows external to the structure. Any vent pipe or elbows external to the structure must be included in total
vent length calculations. See vent length tables.
* Kits must be properly installed according to kit instructions.
1Requires eld-provided outdoor 1-1/2” exhaust accelerator.
2Concentric kits 71M80 and 44W92 include 1-1/2” outdoor accelerator, when uses with 030, 045 and 070 input models. When using 1-1/2 inch vent pipe, transistion to 2”
pipe before installing concentric kit.
3 Flush mount kits 51W11 and 51W12 includes 1-1/2 in. outdoor exhaust accelerator, required when used with 030, 045, 070 and 090 input models.When using 1-1/2” vent
pipe, transition to 2” pipe before installing ushmount kit.
4 Termination kits 30G28, 44W92, 4493 and 81J20 are certied to ULC S636 for use in Canada only.
5 See table 8 for vent accelerator requirements.
6 Requires eld provided 2” to 1-1/2” reducer.
Joint Cementing Procedure
All cementing of joints should be done according to the
specications outlined in ASTM D 2855.
NOTE - A sheet metal screw may be used to secure the
intake pipe to the connector, if desired. Use a drill or self
tapping screw to make a pilot hole.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation..
1 - Measure and cut vent pipe to desired length.
2 - Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from tting socket and result in a
leaking joint.
3 - Clean and dry surfaces to be joined.
4 - Test t joint and mark depth of tting on outside of
pipe.
5 - Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of tting and male end of pipe to depth of
tting socket.
NOTE - Time is critical at this stage. Do not allow
primer to dry before applying cement.
6 - Promptly apply solvent cement to end of pipe and
inside socket surface of tting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.