EasyManuals Logo
Home>Manitowoc>Ice Maker>NEO

Manitowoc NEO User Manual

Manitowoc NEO
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #118 background imageLoading...
Page #118 background image
118 Part Number STH042 3/14
REPLACING PRESSURE CONTROLS WITHOUT
REMOVING REFRIGERANT CHARGE
This procedure reduces repair time and cost. Use it
when any of the following components require
replacement, and the refrigeration system is
operational and leak-free.
Fan cycle control
High pressure cut-out control
High side access valve
Low side access valve
1. Disconnect power to the ice machine.
2. Follow all manufacturers’ instructions supplied
with the pinch-off tool. Position the pinch-off tool
around the tubing as far from the pressure control
as feasible. (See the figure on next page.) Clamp
down on the tubing until the pinch-off is complete.
3. Cut the tubing of the defective component with a
small tubing cutter.
4. Solder the replacement component in place.
Allow the solder joint to cool.
5. Remove the pinch-off tool.
6. Re-round the tubing. Position the flattened tubing
in the proper hole in the pinch off tool. Tighten the
wing nuts until the block is tight and the tubing is
rounded.
NOTE: The pressure controls will operate normally
once the tubing is re-rounded. Tubing may not
re-round 100%.
Important
This is a required in-warranty repair procedure.
!
Warning
Do not unsolder a defective component. Cut it out
of the system. Do not remove the pinch-off tool
until the new component is securely in place.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc NEO and is the answer not in the manual?

Manitowoc NEO Specifications

General IconGeneral
BrandManitowoc
ModelNEO
CategoryIce Maker
LanguageEnglish

Related product manuals