6.6 Watertightness Test and Water Flow Test
Once installation of a drainage piping system is completed, watertightness and water flow tests should be performed.
7 Insulation
7.1 Refrigerant Piping Insulation
7.1.1 Purpose
During operation, the temperature of the refrigerant piping varies. Insulation is required to ensure unit performance and
compressor lifespan. During cooling, the gas pipe temperature can be very low. Insulation prevents condensation forming
on the piping. During heating, the gas pipe temperature can rise to as high as 100°C. Insulation serves as necessary
protection from burns.
7.1.2 Selecting insulation materials
Refrigerant piping insulation should be closed-cell foam of B1 fire resistance rating that can withstand a constant
temperature of over 120°C and that complies with all applicable legislation.
7.1.3 Thickness of insulation
Minimum thicknesses for refrigerant piping insulation are specified in Table 3-7.1. In hot, humid environments, the thickness
of insulation should be increased over and above the specifications in Table 3-7.1.
Table 3-7.1: Refrigerant piping insulation thickness
Pipe outer diameter
(mm)
Minimum insulation thickness (mm)
Humidity < 80%RH
Minimum insulation thickness (mm)
Humidity 80%RH
Ф6.35
15
20
Ф9.53
Ф12.7
Ф15.9
Ф19.1
Ф22.2
Ф25.4
Ф28.6
Ф31.8
Ф38.1
Ф41.3
20
25
Ф44.5
Ф54.0
Watertightness test
Fill the piping with water and test for leakages over a 24-hour period.
Water flow test (natural drainage test)
Slowly fill the drainage pan of each indoor unit with at least 600ml of water through the inspection port and check
that the water is discharged through the outlet of the drain piping.
Caution
The drain plug in the drainage pan is for removing accumulated water prior to performing indoor unit
maintenance. During normal operation, the drain should be plugged to prevent leakage.
Notes for installers

Other manuals for Midea V6R Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Midea V6R Series and is the answer not in the manual?

Midea V6R Series Specifications

General IconGeneral
BrandMidea
ModelV6R Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals