DAILY INSPECTION A-19
11. PREPARATION FOR MACHINE OPERATION AFTER
PROLONGED IDLE PERIOD
Perform the following operations in the order specified after the machine has been idle for a
prolonged period of time
*
.
(1) Forced lubrication of ball screws and spindle bearings.
(2) Full stroke travel of all axes.
(3) Spindle warm-up
*
Prolonged period of time: Two days or more
<Forced lubrication of ball screws and spindle bearings>
Press the manual lubrication button on the lubrication tank for more than 10 seconds. Lubricant is
supplied to the nuts on the ball screws and the spindle bearings.