LID SECURING SCREW x2
SYRUP INLETS x4
MAINS POWER INPUT
CO2 IN
VAND IND
BATH FILL
Utility Connection Locations
Commissioning instructions
The following instructions detail the processes to be followed to prime and brix the unit
before putting the unit into dispense mode to dispense drinks. Please read and follow
these instructions carefully.
1. Remove the top cover by removing the securing screws located at the rear of
the unit as shown above.
2. Removethebathllcapandcarefullyandusingafunnel,llthewaterbathwith
coldcleanwateruntilittricklesfromtheoverowtubewhichexitsviaatube
intothedriptray.Thellvolumeisapproximately10litres.
3. Turn on the mains water supply and check for leaks externally and internally.
4. Turn on the CO2 supply and check for leaks externally and internally.
5. Replace the lid and securing screws.