18 NAPCO StarLink Fire: Getting Started Guide
Signal Loss Test
This test ensures that the SLECDMA-CFB-PS will indicate a supervisory trouble condition to the FACP and cen-
tral station upon loss of signal within the required time period.
Remove the antenna and observe the following indications:
Reconnect the antenna:
Note: In cases where the radio may be located in close proximity to the cell tower, there is a possibility that the
radio may operate properly, even with the antenna removed.
LED Verify this Condition Passed?
Red Trouble LED D5 Blinks 5 times.
Yellow Trouble LED on
SLE-ULPS-R
Blinks 4 times.
Trouble Relay Output on
SLE-ULPS-R
Activates within 60 minutes; check for proper trouble annunciation at
FACP
Supervisory signal E356 will be received by the central station within
60 minutes of the antenna being removed.
Red Trouble LED D5 Turns off.
Yellow Trouble LED on
SLE-ULPS-R
Turns off.
Trouble Relay Output on
SLE-ULPS-R
Restores; check for proper trouble restoral at FACP.
Supervisory restore signal R356 will be received by the central station
within 60 minutes of the antenna being reconnected.