EasyManuals Logo
Home>NETGEAR>Switch>M4100 Series

NETGEAR M4100 Series Hardware Installation Guide

NETGEAR M4100 Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
13
2
2. Hardware Installation
This chapter explains how to install the hardware for the managed switches.
Package Contents
Each switch is packed and shipped separately. The package contains the following items:
Managed stackable switch with preinstalled software
Power cord
Rubber footpads for tabletop installation
Rubber caps for the SFP sockets
Rack-mounting kit
Wall-mounting kit (M4100-D10-POE, M4100-D12G, and M4100-D12G-POE+ only)
Magnetic mounting kit (M4100-D10-POE and M4100-D12G only)
USB console cable with one mini B connector and one type A connector
Resource CD: The CD includes either these documents or links to access them:
- ProSafe Managed Switch Command-Line Interface (CLI) User Manual
- ProSafe M4100 and M7100 Managed Switches Software Administration Manual
- ProSafe M4100 Managed Switch Installation Guide
- This hardware installation guide
ProSafe NMS200 Network Management System 30-day trial DVD
Protecting against Electrostatic Discharge
WARNING!
Static electricity can harm delicate components inside your
system. To prevent static damage, discharge static electricity
from your body before you touch any of the electronic
components, such as the microprocessor. You can do so by
periodically touching an unpainted metal surface on the switch.

Other manuals for NETGEAR M4100 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NETGEAR M4100 Series and is the answer not in the manual?

NETGEAR M4100 Series Specifications

General IconGeneral
BrandNETGEAR
ModelM4100 Series
CategorySwitch
LanguageEnglish

Related product manuals