3.Circuit connection
Attentions
Construction wiring must be installed by a professional technician for construction in accordance
with the circuit diagram.
Appliance installation wiring should be installed in accordance with national wiring rules.
Before installation, please confirm whether your local voltage is match with the voltage showed on
the machine’s nameplate and whether the carrying capacity of the power supply, wires and sockets are
suitable for this machine’s input power.
The power source wire diameter is selected by the nameplate maximum current.
The regulation of insurance tube: according to the reality.
Users are not allowed to change the power cord, wiring work must be carried out by qualified
electricians, and to ensure that the machine metal parts has a good connection with grounding, the
machine shall not be allowed to change the grounding method.
The power connection must be equipped with the unit matching and at least 3mm contact with the
power from the all-pole disconnect device and leakage protection device.
If the power soft wire is damaged, it must be replaced by the manufacturer, its service department,
or similar professional to avoid danger.
Do not insert hands or foreign objects into the outlet of the unit, which will lead to the danger of
personnel and equipment.
The remote controller is fixed by screw and installed indoor with the height above 1.5M. It is
forbidden to install in the environment where the humidity, rain, acidity, corrosivity and light illuminate
directly.
The water quality of the unit must meet the national standard of domestic water consumption,
otherwise it will cause the machine damage, the company does not bear any responsibility.
When the power supply is connected, it must be equipped with an all-pole disconnect device and
leakage protection device that matches the unit and has a distance of at least 3mm from the power
supply; if the power cord is damaged, in order to avoid danger, it must be repaired by the
manufacturer and its maintenance department. Or a professional replacement in a similar department;
After all the wiring work is completed, the power can be turned on after careful inspection.
Unit wiring diagram (the connection between the unit and the power supply and the
interconnection of each individual component is based on the wiring diagram attached to the machine)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nulite NE-C3BZ-B2F and is the answer not in the manual?

Nulite NE-C3BZ-B2F Specifications

General IconGeneral
BrandNulite
ModelNE-C3BZ-B2F
CategoryHeat Pump
LanguageEnglish

Related product manuals