EasyManuals Logo
Home>SMC Networks>Lighting Equipment>TELELIGHT TL90

SMC Networks TELELIGHT TL90 User Manual

SMC Networks TELELIGHT TL90
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
Max. Wind Speed kph (mph) 100 (60)
Bund 120% of fluid content Engine Liquids & Fuel Tank
4. 0PERATION
4.1 INSPECTION & PRELIMINARY OPERATION
4.1.1 Prior to each operation of the Telelight, including raising or lowering the
mast, a thorough inspection should be made. Included in this inspection
must be:
a) Wire ropes and pulleys. Check rope for fraying, kinks and stretching.
Replace if not good working order.
b) Power cable and fittings. Check for chaffing and cuts and other
visible defects. Replace if not in good working order.
c) Mast hydraulic cylinder. Inspect mountings and check for hydraulic
leaks.
d) Mast wear pads. Inspect for damage or wear, replace as necessary.
e) Rotation mechanism function correctly. Check rollers & bushes for
damage or wear, replace as necessary.
f) Lamp fittings are in good working order.
Important! Do not operate lamps with glass damaged or missing,
replace damaged glass immediately. Failure to do so can damage
health. Faulty lamps must be replaced immediately. Failure of lamp
can also result in damaged to the control gear if unit remains switched
on.
c) Outriggers, prop stands & jockey wheel.
d) Check mast deployment warning device is fully functional.
e) Check park brake is operational.
f) Ensure all operation and warning labels are legible.
4.1.2 Check fuel, engine oil, and coolant if appropriate, as per the
instructions in the engine manufacturer’s handbooks.
4.1.3 Check bund daily for fluids, drain into suitable container if necessary.
4.1.4 Each week and before each new operation of the mast; hydraulic
cylinder, wire ropes, electric cable and sockets, lifting points, brakes and
all other safety aspects should be checked by an authorised engineer.
Check battery electrolyte.
4.1.5 Notwithstanding obligations as described in 4.1.1, at 12 monthly ntervals
an examination should be made of the Telelight structure, mast, mast
hydraulic cylinder, and lifting points (if applicable). Wire ropes should be
thoroughly examined at 6 monthly intervals. New wire ropes should be
fitted every 12 months. A competent authority should issue new
certificates after satisfactory testing.
Note! The latter two items apply particularly to the UK. Units used
outside the UK should be homologated to conform to local regulations,
the onus being on the user to research these and comply. In the
absence of local regulations follow as a minimum the rules as above for
the UK, and consult your distributor.
13

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks TELELIGHT TL90 and is the answer not in the manual?

SMC Networks TELELIGHT TL90 Specifications

General IconGeneral
BrandSMC Networks
ModelTELELIGHT TL90
CategoryLighting Equipment
LanguageEnglish