EasyManuals Logo
Home>SMC Networks>Lighting Equipment>TELELIGHT TL90

SMC Networks TELELIGHT TL90 User Manual

SMC Networks TELELIGHT TL90
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
fitted to the Telelight.
4.6.5 Stop the engine according to the procedures given in the ‘Operator’s
Instructions’ label. Consult engine manufacturer’s handbook, if required.
Note: RCD’s are fitted; test their function by using the ‘test’ button
when the generator is running.
IMPORTANT! If the RCD’s/RCBO’s do not function correctly, do not
operate the equipment, seek advise from a competent party.
Note: For terminology refer to descriptions in the parts manual.
4.7 UNIT POSITIONING AND MAST DEPLOYMENT
4.7.1 Check your obligations under 4.1 and 4.2 above and comply.
4.7.2 Level the unit by adjusting the jockey wheel and ensure the ground
upon which it is installed is stable.
4.7.3 Apply the trailer handbrake.
4.7.4 Lower the rear jacklegs first and lock in position, extend the front
outriggers, lower front jacklegs and lock in position.
4.7.4 Check that the jacklegs are on good, stable ground.
4.7.5 Carry out inspection as described in 4.1.1 above.
4.7.6 Carry out check described in 4.1.2 above.
4.7.7 Check the area surrounding the unit is clear of persons and property.
4.7.8 Check overhead, care must be taken to avoid raising the mast in the
proximity of overhead power lines, cables and any obstructions.
4.7.9 Check the emergency stop push button is in the open position (out),if it
is closed turn to release.
4.7.10 Check MCB’s are ‘off’
4.7.11 Connect plugs to outlet sockets on control panel, if applicable.
4.7.12 Adjust lamp units for illumination; slacken retaining fasteners fully prior
to adjusting. Ensure all fasteners are fully tightened after adjustment.
When positioning and illuminating lamps due consideration should be
given to the safety and health implications due to glare for other parties
in the vicinity including motorists.
4.7.13 Raise the mast to the required height with the obvious maximum being
the full extension of all sections, this is controlled by the maximum stroke
of the mast cylinder. The hydraulic relief valve in the power pack will
protect against undo hydraulic overload. Observe during extension that
all mast parts are functioning correctly including the coiled cable.
4.7.14 If illumination is not required, switch off the engine as per procedure
described in 4.6.5 above.
4.8 OPERATING THE LIGHTS
4.8.1 Ensure procedures described in 4.4 have been carried out.
4.8.2 Check, wherever practical, that electrical connections are in good
condition.
4.8.3 Carry out procedures described in 4.6.1
4.8.4 Switch on lamp MCB’s, one at a time.
4.9 OUTLET POWER SOCKETS.
4.9.1 Do not connect or disconnect plugs/sockets without first switching off the
MCB’s.
15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks TELELIGHT TL90 and is the answer not in the manual?

SMC Networks TELELIGHT TL90 Specifications

General IconGeneral
BrandSMC Networks
ModelTELELIGHT TL90
CategoryLighting Equipment
LanguageEnglish