4.9.2 Consult the alternator manufacturer’s handbook to understand the
capability of your alternator. If your proposed use will overload the
alternator adjust your requirement to suit. If you are unsure seek advice
from the Company or your distributor and do not proceed to connect to
the unit until you have been correctly advised. Ensure that when
connecting equipment to the outlet sockets that you may do so safely
and without detriment to the equipment, persons or property.
4.9.3 Subject to your obligations under 4.9.2 above:
a) Switch off MCB’s one at a time
b) Connect and disconnect plugs/sockets as applicable
c) Check that all connections are properly and firmly made and that all
electrical fittings and wiring are in good condition.
d) Switch on the MCB’s one at a time.
.
4.10 LOWERING OF THE MAST.
4.10.1 Check that the Telelight park brake is ON.
4.10.2 Switch off MCB’s and ensure the engine is not running..
4.10.3 Ensure that the area around the unit is clear of persons and property.
4.10.4 Manually rotate the mast until the transport lock engages, see
instruction label on the Telelight.
4.10.5 Operate the hydraulic mast cylinder to lower the mast. Beware of
lamps when lowering.
4.10.6 Observe that all mast parts are functioning correctly and that the coiled
cable retracts into it’s transport stowage tube.
4.10.7 Adjust lamps into their transport position and ensure all fastenings
4.10.8 Failure of the mast to fully lower.
In the unlikely event of the mast sections not fully retracting during
lowering:
4.10.9 Check the mast wires, if any are slack, raise the mast until the wires
are taut.
4.10.10 Ensure that all personnel, including the operator are clear of the
Telelight and remain clear of the working area around the unit.
4.10.11 Consult authorised personnel for advice if required..
NEVER USE UNSAFE EQUIPMENT
4.11 PREPARING FOR REMOVAL FROM SITE.
4.11.1 Following lowering of the mast as described in 4.10 above,
recover the ground earthing spike and cable. Pack for transportation.
4.11.2 Raise jacklegs and ensure they are well secured in their clamps.
Retract outriggers and ensure they are well secured.
4.11.3 Adjust lamp fittings to transport position, see instruction labels on unit,
lock off all retaining fasteners. Caution: lamp fittings may be HOT.
4.11.4 Connect the Telelight to the towing vehicle as required. Raise the jockey
wheel and ensure that it is secure
16

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks TELELIGHT TL90 and is the answer not in the manual?

SMC Networks TELELIGHT TL90 Specifications

General IconGeneral
BrandSMC Networks
ModelTELELIGHT TL90
CategoryLighting Equipment
LanguageEnglish