EasyManuals Logo
Home>Taylor>Freezer>C161

Taylor C161 User Manual

Taylor C161
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
OPERATING PROCEDURES
6-5
085592-M
Operating Procedures
6
20. Install the drip pan.
Figure 6-16
Sanitizing
1. Prepare an approved 100 PPM sanitizing solution
(examples: 2.5 gal. [9.5 L] of Kay-5
®
or 2 gal. [7.6 L]
of Stera-Sheen
®
). Use warm water and follow the
manufacturer's specifications.
2. Pour 1 gal. (3.8 L) of sanitizing solution into the
hopper and allow it to flow into the freezing cylinder.
Figure 6-17
3. While the solution is flowing into the freezing cylinder,
brush clean the mix hopper, the mix inlet hole, and
the feed tube.
Figure 6-18
Figure 6-19
4. Place the power switch in the ON position.
Figure 6-20
12029
12235
12019
13093
131559

Other manuals for Taylor C161

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Taylor C161 and is the answer not in the manual?

Taylor C161 Specifications

General IconGeneral
BrandTaylor
ModelC161
CategoryFreezer
LanguageEnglish

Related product manuals