13 – Maintenance
13.1 Enclosure Maintenance
Flame Path Inspection Criteria
Models: ALIV-QT-XP or ALIV-ST-XP
WARNING:
i. Installation/inspection/maintenance/repair/overhaul/reclamation of the AccuLoad in
addition to all local codes/regulations.
ii.
iii.
inspection / maintenance process.
iv. When performing maintenance that requires opening of the enclosure cover, all
integrity of the flame path are allowed. If defects are detected the equipment should
v.
intact with no missing/stripped threads.
vi.
vii.
viii.
ix.
verify the flame path gaps as per the procedure.