23
POSITIONING THE MOONPHASE WALL CLOCK:
There are two possible ways to mount the Moonphase wall clock:
• use of the foldout table stand, or
• wall mounting
FOLDOUT TABLE STAND
Simply unfold the 2 stands at the back of the clock and place on a flat surface
.
WALL MOUNTING
1) Using a straightedge, horizontally space at 60 mm three screw positions
on a wall.
2) Install three mounting screws (not included) into a wall within
transmission range—leaving approximately 5mm extended from the wall.
3) Place the Moonphase wall clock onto the screws, using the hanging
holes on the backside. Gently pull the Moonphase wall clock down to
lock the screws into place.
Note:
Always ensure that the Moonphase wall clock locks onto the screws before
releasing.
POSITIONING THE OUTDOOR TEMPERATURE TRANSMITTER
The Outdoor Transmitter is supplied with a holder that may be attached
to a wall with the three screws supplied. Before securing the transmitter,
ensure that the 433MHz signal is properly received. To attach to the
wall, please follow the steps below:
1. Mark the wall using a pen through the holes in the holder to obtain
the exact drilling position.
2. Drill holes in the wall at the points marked.
3. Screw holder onto wall.