Setup
MediaandAdditionalParts
Description
Qty.
Use
Ballstud2Mounttoroller
Operator’sManual
1
Readbeforeinstallingandoperatingcuttingunit
Partscatalog1
Usetoreferencepartnumbers
Certicationofcompliance
1
1
InstallingtheFrontRoller
NoPartsRequired
Procedure
Thecuttingunitisshippedwithoutafrontroller.Install
therollerusingtheloosepartssuppliedwiththecutting
unitandinstallationinstructionsincludedwiththeroller.
2
InstallingtheHoopLink,Offset
LinkorChainLink
NoPartsRequired
Procedure
Forcuttingunitsthatwillbemountedonatractionunit
withaserialnumberpriorto240000001,theproperlift
linkmustbeobtainedandinstalled.
TheHoopLink,partNo.105-5740and(2)capscrews,
partno.323-6arerequiredforinstallationonthe
Greensmaster3000,3000-D,3050,3100,3150and
3150-Qtractionunits.
Installthehooplinktothetopofthecuttingunitwith
(2)capscrews.Torquethecapscrewsto25-30ft-lbs.
(34-40N-m)(
Figure3).
Figure3
1.Hooplink
TheOffsetLink,partNo.110–2397and(2)capscrews,
partno.323-6arerequiredforinstallationonthe
Greensmaster3250-Dtractionunits.
Installtheoffsetlink(
Figure4)tothetopofthecutting
unitwith(2)capscrews.Torquethecapscrewsto
25-30ft-lbs.(34-40N-m).Theoffsetlifthookshould
positionedwiththehookforward.
4