Pre-Maintenance
Procedures
PreparingtheMachinefor
Maintenance
1.Parkthemachineonalevelsurface.
2.Engagetheparkingbrake.
3.Shutofftheengineandremovethekey.
4.Emptyandraisethecargobed;refertoRaising
theCargoBedtotheServicePosition(page19).
LiftingtheMachine
DANGER
Themachinemaybeunstablewhenusing
ajack.Themachinecouldslipoffthejack,
injuringanyonebeneathit.
•Donotstartthemachinewhilethemachine
isonajack.
•Alwaysremovethekeyfromthekeyswitch
beforegettingoffthemachine.
•Blockthetireswhenthemachineis
supportedbyliftingequipment.
•Usejackstandstosupportthemachine
onceyouhaveliftedit.
Important:Wheneveryourunthemachinefor
routinemaintenanceand/ordiagnostics,ensure
thattherearwheelsofthemachineare25mm(1
inch)offtheground,withtherearaxlesupported
onjackstands.
•Theliftingpointatthefrontofthemachineis
locatedatthefrontoftheframe,behindthetowing
tongue(Figure21).
g034043
Figure21
1.Frontliftingpoint
•Theliftingpointattherearofthemachineis
locatedundertheaxletubes(Figure22).
28