EasyManuals Logo
Home>Trane>Chiller>CVHE

Trane CVHE User Manual

Trane CVHE
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #89 background imageLoading...
Page #89 background image
CVHE-SVX02M-EN
89
Waterbox Removal and Installation
IImmppoorrttaanntt:: Only qualified technicians should perform
the installation and servicing of this
equipment.
Discussion
This section will discuss recommended hoist ring/
clevises and lifting. Proper lifting technique will vary
based on mechanical room layout.
It is the responsibility of the person(s) performing
the work to be properly trained in the safe practice
of rigging, lifting, securing, and fastening of the
waterbox.
It is the responsibility of the person(s) providing
and using the rigging and lifting devices to inspect
these devices to ensure they are free from defect
and are rated to meet or exceed the published
weight of the waterbox.
Always use rigging and lifting devices in
accordance with the applicable instructions for such
device.
Procedure
WWAARRNNIINNGG
HHeeaavvyy OObbjjeeccttss!!
FFaaiilluurree ttoo pprrooppeerrllyy lliifftt wwaatteerrbbooxx ccoouulldd rreessuulltt iinn
ddeeaatthh oorr sseerriioouuss iinnjjuurryy..
EEaacchh ooff tthhee iinnddiivviidduuaall ccaabblleess ((cchhaaiinnss oorr sslliinnggss))
uusseedd ttoo lliifftt tthhee wwaatteerrbbooxx mmuusstt bbee ccaappaabbllee ooff
ssuuppppoorrttiinngg tthhee eennttiirree wweeiigghhtt ooff tthhee wwaatteerrbbooxx.. TThhee
ccaabblleess ((cchhaaiinnss oorr sslliinnggss)) mmuusstt bbee rraatteedd ffoorr
oovveerrhheeaadd lliiffttiinngg aapppplliiccaattiioonnss wwiitthh aann aacccceeppttaabbllee
wwoorrkkiinngg llooaadd lliimmiitt.. RReeffeerr ttoo tthhee ttaabbllee ffoorr wwaatteerrbbooxx
wweeiigghhttss..
NNoottee:: Refer to Table 25, p. 90 for waterbox weights.
WWAARRNNIINNGG
SSttrraaiigghhtt VVeerrttiiccaall LLiifftt RReeqquuiirreedd!!
FFaaiilluurree ttoo pprrooppeerrllyy lliifftt wwaatteerrbbooxx iinn ssttrraaiigghhtt vveerrttiiccaall
lliifftt ccoouulldd ccaauussee tthhee eeyyeebboollttss ttoo bbrreeaakk wwhhiicchh ccoouulldd
rreessuulltt iinn ddeeaatthh oorr sseerriioouuss iinnjjuurryy ffrroomm oobbjjeecctt
ddrrooppppiinngg..
TThhee pprrooppeerr uussee aanndd rraattiinnggss ffoorr eeyyeebboollttss ccaann bbee
ffoouunndd iinn AANNSSII//AASSMMEE ssttaannddaarrdd BB1188..1155.. MMaaxxiimmuumm
llooaadd rraattiinngg ffoorr eeyyeebboollttss aarree bbaasseedd oonn aa ssttrraaiigghhtt
vveerrttiiccaall lliifftt iinn aa ggrraadduuaallllyy iinnccrreeaassiinngg mmaannnneerr..
AAnngguullaarr lliiffttss wwiillll ssiiggnniiffiiccaannttllyy lloowweerr mmaaxxiimmuumm
llooaaddss aanndd sshhoouulldd bbee aavvooiiddeedd wwhheenneevveerr ppoossssiibbllee..
LLooaaddss sshhoouulldd aallwwaayyss bbee aapppplliieedd ttoo eeyyeebboollttss iinn tthhee
ppllaannee ooff tthhee eeyyee,, nnoott aatt ssoommee aannggllee ttoo tthhiiss ppllaannee..
Review mechanical room limitations and determine the
safest method or methods of rigging and lifting the
waterboxes.
1. Determine the type and size of chiller being
serviced. Refer to Trane® nameplate located on
chiller control panel.
IImmppoorrttaanntt:: This section contains rigging and lifting
information only for Trane CenTraVac
chillers built in La Crosse. For Trane
CenTraVac
chillers built outside the
United States, refer to literature
provided by the applicable
manufacturing location.
2. Select the proper lift connection device from Table
26, p. 91. The rated lifting capacity of the selected
lift connection device must meet or exceed the
published weight of the waterbox. Verify the
waterbox weight from the latest published
literature.
3. Ensure that the lift connection device has the
correct connection for the waterbox (e.g., thread
type [course/fine, English/metric] and bolt diameter
[English/metric]).
4. Properly connect the lift connection device to the
waterbox. Refer to the following figure and ensure
that the lift connection device is securely fastened.
Install hoist ring on to the lifting connection on the
waterbox. Torque to 100 ft·lb (135.6 N·m) for 3/4-in.
(19.05-mm) threaded connections and 28 ft·lb
(38.0 N·m) for 1/2-in. (12.7-mm) threaded
connections.
5. Disconnect water pipes, if connected.
6. Remove waterbox bolts.
7. Lift the waterbox away from the shell.
WWAARRNNIINNGG
OOvveerrhheeaadd HHaazzaarrdd!!
FFaaiilluurree ttoo ffoollllooww iinnssttrruuccttiioonnss ccoouulldd rreessuulltt iinn
ddeeaatthh oorr sseerriioouuss iinnjjuurriieess..
NNeevveerr ssttaanndd bbeellooww oorr iinn cclloossee pprrooxxiimmiittyy ttoo
hheeaavvyy oobbjjeeccttss wwhhiillee tthheeyy aarree ssuussppeennddeedd ffrroomm,,
oorr bbeeiinngg lliifftteedd bbyy,, aa lliiffttiinngg ddeevviiccee iinn ccaassee tthhee
oobbjjeecctt ddrrooppss..
8. Store waterbox in a safe and secure location and
position.
NNoottee:: Do NOT leave waterbox suspended from
lifting device.

Table of Contents

Other manuals for Trane CVHE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane CVHE and is the answer not in the manual?

Trane CVHE Specifications

General IconGeneral
BrandTrane
ModelCVHE
CategoryChiller
LanguageEnglish

Related product manuals