80
SCXF-SVX01Q-EN
• Verify liquid line filter driers installed.
Units with Hydronic Heat
• Verify the entering water temperature sensor is
installed upstream of the hydronic coil.
Units with Electric Heat
• Verify that a zone temp sensor is installed.
Electrical
• Verify electrical connections are tight.
Components
• Verify liquid line service valve, and suction and
discharge service valves if present, are open at
startup.
NNoottee:: Each compressor suction line contains a low
pressure sensor that will shut the
compressor down in low pressure situations.
See Table 35, p. 62.
• Ensure system components are properly set and
installed.
PPrree--SSttaarrttuupp