9
PKGP-SVX03D-EN
Rigging and placement
Please use the forklift with proper capacity tonnage to transport and handle, for weight of each
model please refer to reference table 1.
Table 1.
Please install the water chiller at a place with well drainage facilities to facilitate massive drainage
during shutdown or repair.
Please use the forklift with proper capacity tonnage to move this water chiller to its installation
position. During lifting work, please use canvas sling, which shall be wrapped across the water
chiller pedestal and tied tightly, as shown in Figure 1.
Installation
Model The maximum net weight (kg)
≈
0305R 130
0306R 131
0505R 141
0605R 149
0606R 320
0755R 202
1005R 449
1205R 530
1505R 530
2005R 540
Protection
Cliver
Protection
Tape
Tape
sling
sling
Protection
Protection
Base
Figure 1. Rigging