52
S8V2-SVX001-1A-EN
Horizontal right orientation with top venting
Refer Step 2. to Step 5. and Step 7.
Downflow orientation with left side venting
Refer Step 2. to Step 6.
Downflow orientation with right side venting
Refer Step 2. to Step 6.
Downflow orientation with top venting
Note: Requires kit BAYVENT600. Kit used with B, C, and D cabinets
only. Follow kit instructions for installation.
Note: 4” Type B double wall vent pipe must be used inside of the
furnace cabinet.
Refer to Step 2., Step 3., Step 4., Step 8. and Step 6.
IInnssttaallllaattiioonn IInnssttrruuccttiioonnss
1. No changes need to be made to the inducer when
installing the furnace in upflow position when
vented through the top.
2. Before proceeding, lay unit on its back to make the
conversion easier.
3. Remove the four screws holding the inducer in
place.
4. Rotate the inducer so the inducer outlet is pointing
towards the 5” cutout.
5. Secure the inducer in place using the screws
removed in step 3.
6. Attach the vent to the inducer outlet.
7. Attach the vent outlet gasket to the vent outlet.
8. Install BAYVENT600 kit per the kit instructions.
FFuurrnnaaccee CCoommbbuussttiioonn AAiirr EExxhhaauusstt OOppttiioonnss