EasyManuals Logo
Home>Wacker Neuson>Construction Equipment>MP15

Wacker Neuson MP15 User Manual

Wacker Neuson MP15
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
MP15 Maintenance
wpm_tx001873gb.fm 23
5.5 Drive Belt
See Graphic: wpmgr008610
On new machines or after installing a new belt, check the belt tension
after first 20 hours of operation. Check and adjust the belt every 50
hours thereafter.
To adjust the belt:
5.5.1 Loosen the two screws (a) on the beltguard, then remove the
beltguard, keeping the screw assemblies captured on the beltguard.
5.5.2 Loosen the four nuts (b) which hold the engine to the console, and the
screw (c) which holds the beltguard back to the console.
5.5.3 Slide the engine backward (towards the handle) to tighten the belt,
forward to loosen the belt.
5.5.4 Adjust the belt so that it deflects 10–13 mm (d) when pressed midway
between the belt pulleys.
5.5.5 Make sure that the clutch pulley (f) and the exciter pulley (e) are in
alignment. Place a straight edge against the exciter pulley (e) and
move the engine so that the two pulleys are parallel.
5.5.6 Torque all nuts and screws to 20.5 Nm as you reassemble the
machine.
wpmgr008610
a
b
e
c
d
f

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson MP15 and is the answer not in the manual?

Wacker Neuson MP15 Specifications

General IconGeneral
BrandWacker Neuson
ModelMP15
CategoryConstruction Equipment
LanguageEnglish

Related product manuals