INSTALLATION
9
EZ Anchors
6. Tap EZ anchor tip into marked drywall
locations, turn with screwdriver until seated
flush.
Note: use EZ anchors provided only on
hollow drywall applications (minimum
drywall thickness 1/2”). If a stud or wood
surface is present, fasten anchors with
screws directly into stud or plywood. For all
other wall types (concrete, brick, tiles etc.),
use appropriate anchors for mounting.
7. Fasten 2 wall brackets provided onto
anchors
8. Pry open 3/4” electrical knock out
9. Connect power source to hood (make
sure power source is turned off).
DANGER
All electrical work must be performed by
qualified electricians only. Do not attempt to
wire the appliance if you are inexperience
with and/ or without proper electrical
working background and qualifications.
All electrical work must meet local codes and
requirements for safety.
Electrical Connection

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr Typhoon AK2100 and is the answer not in the manual?

Zephyr Typhoon AK2100 Specifications

General IconGeneral
BrandZephyr
ModelTyphoon AK2100
CategoryVentilation Hood
LanguageEnglish

Related product manuals