Chapter2RoutineMaintenance
ItemStep
StandardrequirementsThepowercableandthegroundingcableare
connectedproperlyandtheyarefreeofrust.
TroubleshootingIfthepowercableandthegroundingcableare
notconnectedproperly,pleasereconnector
changethem.
PowerSupplyandVoltageCheck
Table2-5liststhepowersupplyandvoltagecheckinformation.
Table2-5PowerSupplyandVoltageCheck
ItemStep
MetersMultimeter
CheckmethodMaintenancepersonnelmeasuretheACandDC
voltagesoftheinputpowerwithamultimeterand
keeparecord.
Standardrequirements1.TheZXA10C320uses–48/60Vpower
supply.Theequipmentroomshouldbe
installedwithAC/DCpowertransforming
equipmenttosupplyworkingpower.TheDC
powervoltageisallowedtouctuatebetween
–72Vand–38V.
2.Inordertoensurecontinuousworkingofthe
ZXA10C320deviceincaseofthemains
powerfailure,itisnecessarytoprovidethe
uninterruptedpowersupplymeasures,such
asdiesel-electricsetandstoragebattery.
3.DCpowersupplyshallhave
over-voltage/currentprotectionand
indication.
TroubleshootingWhenthetestresultisnotinthestandardrange,
pleasechecktheinputpowersupplytimelyand
makesurethebackuppowersupplyisinthe
workingstatus.
FansRunningStatusCheck
Table2-6liststhefanrunningstatuscheckinformation.
Table2-6FansRunningStatusCheck
ItemStep
MetersNone
2-5
SJ-20120615152640-008|2012-06-30(R1.0)ZTEProprietaryandCondential

Other manuals for Zte ZXA10 C320

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zte ZXA10 C320 and is the answer not in the manual?

Zte ZXA10 C320 Specifications

General IconGeneral
Product TypeOptical Line Terminal (OLT)
Chassis Height2U
Service Slots2
Uplink Slots2
RedundancySupported
Uplink Ports4 x 10GE