3 Charging instruction
3.1 Charging with 1 Depot Charge Box
Start charging:
1. Park the electric vehicle with the charge inlet within reach of the connector.
2. Turn off the electric vehicle.
3. Connect the charger’s connector to the vehicle’s charge inlet.
4. The charger will automatically start to charge the vehicle after the preparation
phase, and will indicate the progress by the LED state (see 2.3).
Stop charging:
5. The charge session will continue to charge the bus until the charge session is
stopped.
6. The charge session can be stopped manually by either pushing the stop button
on the depot charge box or the stop button on the bus (not available on every
bus).
7. Charging stops
8. The connector is unlocked by the vehicle for CCS when the Depot box beacon
light changes color to green
9. Take the connector out of the vehicle and put it back in the connector holder on
the depot charge box.
3.2 Charging with 2 or 3 Depot Charge Boxes
The main principle of the sequential charging is to complete the bulk charge for all the
buses that are connected to the charger, before they leave the depot in the morning. The
sequence will be based on the principle first come, first serve.
When the bulk charge is complete the charger will automatically continue with the pre-
conditioning. The charger will follow the same sequence as during bulk charging (first
come, first serve) in a continuous time loop of 20 minutes per bus.
Start charging:
1. Park the electric vehicle with the charge inlet within reach of the connector.
2. Turn off the electric vehicle.
3. Connect the charger’s connector to the vehicle’s charge inlet.
4. When there is no other bus already connected that requires bulk charging:
The charger will automatically start to charge the vehicle after the prepa-
ration phase, and will indicate the progress by the LED state (see 2.3).
5. When there is another bus already connected that is being charged:
The LED state will turn to green and start blinking until the other charge
sessions are complete. After completing the other bulk charge session(s)
the charger will automatically start to charge the vehicle after the prepa-
ration phase, and will indicate the progress by the LED state (see 2.3).
6. When all buses completed the bulk charge (SOC > 95% OR Bulkchargecomplet
flag = true (initiated by the bus)) the preconditioning will start, following the
same sequence as the bulk charge with a time interval of 20 min between each
bus.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB HVC 100C and is the answer not in the manual?