6
EN
Transport and handling
Transportation of the equipment, especially by road, must be carried out using appropriate vehicles and methods to protect the
components (particularly electronic components) from violent shocks, humidity, vibration, etc.
Unpacking and checking
The components of the packaging must be disposed on in accordance with the regulations in force in the country of installation.
When you open the package, check that the equipment is undamaged and make sure all the components are present. If you find any
defects or damage, stop unpacking and consult the carrier, and also promptly inform the Service ABB.
Equipment weight
Device Weight (kg/lb) Lifting points Holes for handles (optional) or Eyebolts UNI2947 (not supplied)
Power module 70 kg / 154 lbs 4 M8. Kit of handles (04) (to be ordered)
Wiring box ~ 55 kg / 121 lbs 4 M8. Kit of handles (04) (to be ordered)
Lifting
Risk of injury due to the heavy weight of the equipment!
ABB usually stores and protects individual components by suitable means to make their transport and subsequent handling easier.
Nonetheless, as a rule, it is necessary to turn to the experience of specialised staff to take charge of loading and unloading components.
The power module and the wiring box must be lifted using the 4 handles (04) (to be ordered) or alternatively using suitable lifting
equipment.
The means used for lifting must be suitable to bear the weight of the equipment.
In case of manual lifting the number of required operators necessary to lift the equipment must be in accordance
to local regulations relating lifting limits per operator
The handles (04) must be mounted into the designated holes located on the enclosures.
If lifting with ropes, M8 eyebolts can be mounted in the same holes.
Handling and installation operations shall be performed only by using the special tools and accessories provided
with “PVS Installation Kit” that have to be ordered separately. The use of these equipment are mandatory to safely
install the inverter. Refer to “Kit of recommended spare parts” chapter content in the product manual for further
information.
DO NOT grab the equipment from the rear flange!
Risk of injury due to cutting surfaces and risk of
equipment damange. Always use proper lifting equip-
ment!
It is required to use one of the following lifting methods to move the equipment during installation or maintenance phases:

Vertical lifting

Horizontal lifting

SERVICE ONLY
M8. Kit of handles (04) (to be ordered)
SERVICE ONLY
M8. Hole for Eyebolts UNI2947 (not supplied)
*lifting balancer must be 20 cm longer
(per side) than the lifted device.
PVS-120.0
SERVICE ONLY
M8. Hole for Eyebolts UNI2947 (not supplied)
*lifting balancer must be 20 cm longer
(per side) than the lifted device.
Lifting and transport
(Continue to next page)

Other manuals for ABB PVS-100-TL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PVS-100-TL and is the answer not in the manual?

ABB PVS-100-TL Specifications

General IconGeneral
BrandABB
ModelPVS-100-TL
CategoryInverter
LanguageEnglish

Related product manuals