EasyManuals Logo
Home>ABB>AC Power Distribution>SafeRing

ABB SafeRing User Manual

ABB SafeRing
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
29
15.5 INSTALLATION AND REPLACEMENT OF FUSE-LINKS
A red indicator below the fuse symbol on the lower front panel
indicates that at least one fuse-link has blown. Fuse links are
replaced as shown in the sequence of illustrations. Switch-
fuse configurations are supplied without fuse-links installed.
When installing fuse-links for the first time, follow the
sequence of illustrations 2-9.
1. Blown fuse indicator.
2. Close earthing switch by turning operating handle
clockwise.
15.4 OPERATION OF FUSE-SWITCH DISCONNECTOR
Switch-fuse disconnector:
Charging springs: Turn the operating handle clockwise to
charge the closing and the opening spring.
Close: Push the green button (A)
Open: Push the red button.(B)
The circuit-breaker can be tripped by the protection relay,
while in switch-fuse configurations the fuse switch disconnec-
tor can be triggered by the fuse striker pin if an over-current,
a short-circuit or an earth-fault occurs.
WARNING
For correct function of F-module, it is required
to use fuses suitable for rating of protected
distribution transformer, see fuse selection
table on following pages. Use of improper
fuse can void the warranty.
B A

Table of Contents

Other manuals for ABB SafeRing

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB SafeRing and is the answer not in the manual?

ABB SafeRing Specifications

General IconGeneral
BrandABB
ModelSafeRing
CategoryAC Power Distribution
LanguageEnglish

Related product manuals