Tightening torques for turbocharger components
The specified tightening torques of screw connections for turbocharger
components must be observed. (See section Table of tightening torques.)
Tightening torques for assembly devices of ABB Turbo Systems
If nothing else is described, the screws and nuts of the assembly devices
must be tightened down firmly.
Loads not suspended in compliance with regulations may lead to per-
sonal injury or accidents with fatal consequences.
Attach turbochargers, assemblies or individual components only to
lifting gear which is in technically perfect condition and has sufficient
load capacity.
Make sure the load is suspended properly on the crane hook.
Do not let anyone stand beneath a suspended load.
Wear safety gloves against mechanical risks.
Defined load carrying point on a component or an assembly (blind hole
thread, eye, lug).
Devices mounted on the turbocharger to create a suspension point.
Assembly devices are calculated and designed especially for the de-
fined application. They are not commercially available products. Use
assembly / fitting devices only for the applications described.
Equipment for lifting and transporting loads (ropes, chain hoists,
cranes). Lifting gear is not supplied by ABB Turbo Systems.