EasyManuals Logo
Home>Absen>Monitor>HC Series

Absen HC Series User Manual

Absen HC Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
- 20 - New HC Series User Manual
one or more sending box to receive and feed the source to it.
4.4 Power-on test
After the cabinet connection is completed, please use a multimeter to measure whether there is
short circuit at the AC input (L/N/PE) and DC output (VCC/GND) of the power supply. If a short
circuit is found, please check the circuit carefully. After ensuring the cable is normal, switch on the
power to electrify the cabinets to work.
Note: Please refer to the software user manual for software operation.
5. Maintenance
5.1 Preparation Tools
Preparation tools include: module front service tool, cross screwdriver, multimeter, etc.
Maintenance
Tool List
Tools type
function
Diagram
Module front
service tool
Installation and removal LED
module
PH2 cross
screwdriver
Installation and removal HUB,
receiving card, power supply
PH00 cross
screwdriver
Installation and removal the
AC fixing screws on the
power supply
multimeter
Measure power cables and
distribution boxes
5.2 Maintenance Instructions
5.2.1 Module Maintenance
Put the front service tool onto the surface of the module, then press the button of the tool to
suck out the module, hold the module by hand and release the button.
Take HC1.2 Pro as an exampleHC0.7 Pro and HC0.9 Pro are designed with small size
PCB, which requires the use of a dedicated small PCB module maintenance tool:

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Absen HC Series and is the answer not in the manual?

Absen HC Series Specifications

General IconGeneral
BrandAbsen
ModelHC Series
CategoryMonitor
LanguageEnglish

Related product manuals