3-40 Machine Maintenance Procedures
LVDS Cable Installation 0
1. Place the LVDS cable into the LCD panel connector (D) and secure the clear mylar
tape (C) (Figure 3-41).
2. Adhere the yellow tape (B) to the LVDS cable connector to secure it (Figure 3-40).
3. Place the LVDS cable (E) on the rear of the LCD panel. Refer to Figure 3-42.
4. Adhere the sliver masking tapes. Refer to Figure 3-39.
5. Install the LCD panel.