8AL90850USAAed01 15
2 UNPACKING
PROCEDURE: “Unpacking”.
Actions
1. Open the card board box and take the 4080 IP-DECT out.
2. Open the card board box and take the 4080 IP-DECT out.
3. Check the 4080 IP-DECT on any damages.
4. Continue with one of the following Chapters:
− When you mount the 4080 IP-DECT vertically, the antenna position will normally
be OK, and when you do not need to install the G.729 Daughter Board, continue
with Chapter 5 MOUNTING THE 4080 IP-DECT AGAINST A WALL.
− When you mount the 4080 IP-DECT horizontally, you probably need to change
the antenna position. Consult Chapter 3. ADJUSTING THE ANTENNA
POSITION.
− When you require G.729 codec support, you will have to install the G.729
Daughter Board. Consult Chapter 4. MOUNTING THE G.729
DAUGHTERBOARD