Fitting the 5” Flue
(Ø 80 / 125 Horizontal/vertical)
Once the boiler has been positioned on the wall, it is necessary
to insert the Ø80/125 adaptor (Fig. 5) for both horizontal and
vertical ue runs into the boiler ue socket (not supplied with
ue kit - Part No 3318095).
Push the adaptor onto the boilers ue connection, grease the
seals then add extensions or elbows as required, secure the
adaptor, using the clamp and screws provided.
To t extensions or elbows it is rst necessary to ensure that
the lip seal is tted correctly into the inner ue, once veried,
it is simply necessary to push them together, no clamps are
necessary to secure the ue components.
Before proceeding to t the ue, ensure that the maximum ue
length has not been exceeded (See the tables) and that all
elbows and bends have been taken into consideration, for each
additional 90° elbow 1 metre must be subtracted from the total
ue length, and for each 45° 0.5 metres must be subtracted from
the total ue length (the height of the vertical adaptor and a 45°
bend can be seen in Fig.6 and a 90° bend in Fig. 7).
Note: DO NOT cut the vertical ue kit.
180 mm
Total length
of Vertical Kit
1240 mm
5" Adaptor
Part no: 3318095
* This length will vary
according to the type
of ashing installed
Useable length
of Vertical ue
575 mm*
Fig. 5
Clamp
Seal
Screws
Fig. 4
Fig. 6
Fig. 7