300676782_002_C0
6996 0229 87 Issue A – 05/2017 – © Leybold 34
1 Remove the canopy panel(s) in order to get access to the internal components.
2 Remove the oil filler plug (1).
3 Pour oil in the gearbox up to the middle of the sight glass (2).
4 Close the filler plug. Remove all oil spills on the pump and/or floor.
5 Reinstall the canopy panel(s).
4.4 Stopping
It is recommended to run the unit isolated for typically 15 minutes pumping clean dry air at around 50-
100 mbar(a) prior to switching off. If the air stream was heavily contaminated with water vapour, a
longer period of running the unit off-line can only extend lifetime.
4.5 Taking out of operation
CAUTION
The operator must apply all relevant safety precautions. See section Safety precautions
during operation.
Also consult section Problem solving.
Procedure:
Switch off the voltage and disconnect the pump from the mains.