EasyManuals Logo
Home>Atlas Copco>Air Compressor>LT 2

Atlas Copco LT 2 User Manual

Atlas Copco LT 2
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #52 background imageLoading...
Page #52 background image
4. For the full feature units, also push the switch to position I to start up the refrigerant dryer. Approximately
10 minutes later, the nominal dewpoint will be reached.
To ensure optimum operational efficiency, do not use dryer on/switch repeatedly within a
short time period.
Wait at least 5 minutes to start the dryer again after stopping to allow pressure equalization.
5. Open the air outlet valve (AV).
Regularly drain condensate
LT Trolley with electrical motor
1. On LT check the oil level, which must be near the top of the red circle of sight-glass (SG). The minimum
level is the lower part of the red circle.
2. Set pilot valve (RV) in the unload position by turning the red handle 90 degrees. See section Adjustment
of pilot valve.
3. Attach the air lines to the air outlets.
Instruction book
50 2920 7089 90

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco LT 2 and is the answer not in the manual?

Atlas Copco LT 2 Specifications

General IconGeneral
BrandAtlas Copco
ModelLT 2
CategoryAir Compressor
LanguageEnglish

Related product manuals