FOR THE INSTALLER
Preparations before connection
Preparations before connection
Moving the heat transfer uid pipe for
side entry
When the heat pump is supplied the heat transfer fl uid side is assembled
for a top installation. This means the pipes for heat transfer fl uid in and
heat transfer fl uid out run through the top of the heat pump.
If the heat pump is positioned in the house so it is diffi cult to install the heat
transfer fl uid pipes on the heat pump from above, they can be fi tted from the
side (side installation). Both the right- and left-hand sides are prepared for
side installation. The following pages describe side installation.
Side installation should be done before the heat pump is positioned in its
nal installation location.
The heat transfer fl uid pipes are
tted for top installation when the
heat pump is delivered.
In some situations the heat pump may need extra preparations before it is
commissioned. Such preparations may be:
Moving the heat transfer fl uid pipe for side entry
Supplement the heat pump with a ground water system

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Bosch EHP 6-11 LW and is the answer not in the manual?

Bosch EHP 6-11 LW Specifications

General IconGeneral
BrandBosch
ModelEHP 6-11 LW
CategoryHeat Pump
LanguageEnglish

Related product manuals