EasyManuals Logo
Home>Dell>Switch>Networking S3100 Series

Dell Networking S3100 Series User Manual

Dell Networking S3100 Series
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
Figure 21. 1U Tool-Less Configuration
Configuring a Two-Post Flush-Mount
To install your switch using a two-post flush-mount configuration, follow these steps.
1. For this configuration, remove the castings from the front side of each ReadyRails assembly. See item
1 in the following illustration. To remove the two screws from each front flange ear (on the switch
side of the rail) and remove each casting, use a Torx driver. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2. Attach one rail to the front post flange with two user-supplied screws. See item 2 in the following
illustration.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws. See item 3 in the following illustration.
4. Repeat this procedure for the second rail.
30
Installation

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dell Networking S3100 Series and is the answer not in the manual?

Dell Networking S3100 Series Specifications

General IconGeneral
BrandDell
ModelNetworking S3100 Series
CategorySwitch
LanguageEnglish

Related product manuals