Planning
CMW
Planning
1. Gather information about jobsite. See page 54.
2. Inspect jobsite. See page 55.
3. Classify jobsite. See page 56.
4. Select chain and teeth to match your soil type, if necessary. See page 99.
5. Check supplies and prepare equipment. See page 58.
6. Haul equipment to jobsite. See page 69.
Trenching
1. Start unit. See page 60.
2. Position tractor and controls. See page 75.
3. Begin trenching. See page 75.
4. Engage optional cruise control if desired. See page 98.
5. Engage optional Trench Depth Meter if desired. See page 99.
6. Complete the installation. See page 75.
7. Backfill the trench. See page 104.
8. Shut down tractor. See page 62.