Operation Overview - 68 RT80Q Operator’s Manual
Planning
CMW
Planning
1. Gather information about jobsite. See 72.
2. Inspect jobsite. See page 73.
3. Classify jobsite. See page 74.
4. Select chain and teeth to match your soil type, if necessary. See page 135.
5. Check supplies and prepare equipment. See page 76.
6. Haul equipment to jobsite. See page 83.
Trenching
1. Start unit. See 78.
2. Position tractor and controls. See page 96.
3. Begin trenching. See page 96 .
4. Engage cruise control if desired. See page 132.
5. Engage optional Trench Depth Meter, if equipped.
6. Complete the installation. See page 139.
7. Shut down tractor. See page 81.
Plowing
1. Start unit. See page 78.
2. Position tractor and controls. See page 103.
• offset plowing - page 107
• coordinated plowing - page 107
• crabbing - page 107
3. Attach product. See page 103.
4. Begin plowing. See page 106.
5. Engage cruise control if desired. See page 132.
6. Complete the installation. See page 139.
7. Shut down tractor. See page 81.