5.8 Initial startup
Start-up and operational checks must be performed by a qualified service
personnel authorized by Eaton. If these instructions are not followed, the
warranty terms specified in Chapter 11 become void. This service is
offered as a part of the sales contract for the UPS. Contact your Eaton
service representative in advance to reserve a preferred startup date.
5.9 Completing the installation checklist
The final step in installing the UPS system is completing the installation
checklist, see Section 4.2. This checklist ensures that you have
completely installed all the hardware, cables, and other equipment.
Complete all the items listed in the checklist to ensure a smooth
installation. Make a copy of the installation checklist before filling it out,
and retain the original.
After the installation is completed, an Eaton Customer Service Engineer
must verify the operation of the UPS system and commission it to
support the critical load. The service representative cannot perform any
installation tasks other than verifying the software and the operating
setup parameters. Service personnel may request a copy of the
completed installation checklist to verify that all the applicable
equipment installations have been completed.
NOTE: The installation checklist must
be completed prior to starting the
UPS system for the first time.