IQ8AC/IQ8HC Installation and Operation Manual
14 © 2023 Enphase Energy Inc. All rights reserved. June 2023
USM-00005-2.0
5. Enphase microinverters installation
Installing the IQ8 Series Microinverters involves several key steps. Each step listed here is detailed in
the following pages.
Step 1: Position the IQ Cable
Step 2: Position the junction box
Step 3: Mount the microinverters
Step 4: Create an installation map
Step 5: Manage the cabling
Step 6: Connect the microinverters
Step 7: Terminate the unused end of the IQ Cable
Step 8: Complete the installation of the junction box
Step 9: Connect the PV modules
Step 10: Energize the system
Horizontal mount
Vertical mount