AFTER INSTALLATION THE END USER SHOULD
KEEP THIS GUIDE FOR FUTURE REFERENCE
DO NOT
THROW AWAY
6
Box Contents
• 1 x MEV Spider unit
• 3 x ø100mm Spigots
• 1 x Spigot blank cap
• 1 x User guide
• 4 x Screws 8g x 2.0”
• 4 x Steel washers
• 4 x Plasterboard plugs
• 8 x Adhesive foam pads
• 4 x Rubber sleeves
• 1 x Wireless remote control (MEVS-W units only)
• 1 x Wired boost switch (MEVS-H units only)
Pre-installation checklist
• Does the unit fit in the space where it will be installed?
• Is there room to connect ducts to the spigots without tight duct bends?
• Are there any obstructions above or below the locations where the
extract valves are to be fitted?
• Is the mounting surface strong enough to support the unit?
• Is the mounting surface level?